Gulf Orbit supplies duct fabricators to HVAC contractors and sheet-metal shops anywhere in Saudi Arabia. Fabricators produce galvanised or pre-insulated duct sections, fittings and transitions from shop drawings and cutting lists, check dimensions before release, and mark each piece for the site installation sequence.
Quick facts
Trade
Duct Fabricator · Mechanical & Electrical Trades
Worker cards
Site-specific cards and approvals are confirmed per request.
Duct systems
Galvanised steel (GI) sheet duct and pre-insulated panel duct
Works from
Shop drawings and cutting lists, to your construction standard (commonly SMACNA)
Usually supplied with
Duct fitters for site installation, and helpers in the shop
Documents with the CV
CV, iqama and profession documents
Mobilization
Mobilization of in-Kingdom personnel to project sites anywhere in Saudi Arabia takes 48–72 hours from purchase order (PO), subject to worker documents and site approvals.
RFQ response
Complete RFQs get a response within 24 hours: a priced quotation, or an acknowledgement with any questions needed to price it.
What they do on site
Mark, cut and form sheet metal duct sections
Assemble fittings, transitions and flanged connections
Check dimensions against shop drawings before release
Maintain identification for site installation sequence
A duct fabricator works in the shop, turning flat sheet or panels into straight sections, bends, transitions and fittings. A duct fitter works on site, hanging, connecting and sealing those pieces in the ceiling void or plant room. The skills overlap, but the working conditions and tools differ. Request fabricators for shop output and fitters for installation, and say if the same people must do both.
Galvanised sheet or pre-insulated panel
Galvanised steel (GI) duct is formed from sheet on folders, rollers and seamers, with seams and flanged joints to the construction standard your project follows, commonly SMACNA. Pre-insulated duct is cut from foam panels with aluminium facing, glued and fitted with profiles. The two are different skills, and a fabricator strong on one is not automatically productive on the other. State which system your job uses.
Shop drawings, marking and release
A duct shop is only as good as its release control. Each piece is cut from a cutting list, checked against the shop drawing, and marked with its drawing reference and location so the site crew can install it in sequence. If marking is missed, pieces are lost on site and re-made. Tell us your shop drawing and marking system, so fabricators who have worked to a release process are put forward.
Pressure class and special duct
Duct construction changes with pressure and service. Low-pressure supply and return duct uses lighter gauge and simpler seams. Medium- and high-pressure duct needs heavier gauge, reinforcement and sealed seams, and kitchen exhaust and smoke extract duct follow their own rules for material, joints and access doors. State the pressure class and any special duct types in the RFQ, so fabricators are matched on the work your shop actually has.
What to check before they start
Check the CV against your duct system, GI or pre-insulated, and the machines your shop runs.
Give each fabricator a fitting from your shop drawings on day one and check the layout and dimensions before production starts.
Check seams, flanges and sealant on the first pieces against your standard and pressure class.
Brief the shop's marking and release system before the first batch leaves for site.
Brief machine guarding and hand-safety rules for folders, guillotines and seamers before work starts.
Typical crew shape
A duct shop usually runs fabricators on marking, cutting and forming, helpers handling sheet and finished pieces, and a shop foreman or supervisor controlling drawings and release. On site, duct fitters install what the shop produces, and duct insulators follow them. Send your output target and shop layout, and the shop crew is proposed together.
Send how many workers you need for Duct Fabricator, the city, the start date and the duration. CVs and documents for each worker come to you for approval, and nobody mobilizes before you approve them. See the full request process
Frequently asked questions
What is the difference between a duct fabricator and a duct fitter?
A duct fabricator makes duct sections and fittings in the shop from sheet or panels. A duct fitter installs them on site. Both are on the register, so request each for the part of the work you need.
Can fabricators work with both GI and pre-insulated duct?
Some can, but the skills differ. State the system in the RFQ, GI sheet or pre-insulated panel, and fabricators are matched on it.
Which duct construction standard do your fabricators work to?
Fabricators work to your project's standard and shop drawings, commonly SMACNA on Saudi projects. State the standard and pressure class in the RFQ.
Do fabricators work on our shop machines?
Yes. Fabricators are supplied as manpower to work in your shop with your folders, rollers, seamers and cutting tables. Say which machines your shop runs, so fabricators familiar with them are put forward.
Can duct fabricators and MIG welders be supplied together?
Yes. Where the duct scope includes welded kitchen exhaust or heavy-gauge work, MIG welders can be requested on the same RFQ.
How quickly can duct fabricators mobilize?
Mobilization of in-Kingdom personnel to project sites and workshops anywhere in Saudi Arabia takes 48–72 hours from purchase order (PO), subject to worker documents and site approvals.