Scaffolding rental prices are not published, because no two access lists cost the same. The quotation is built from these drivers:
System: cuplock, ringlock or tube and coupler, chosen for the structure and your site's rules.
Quantity and height: the work fronts, heights and any cantilevers or birdcages on your drawings.
Rental period: how long each structure stays up, and whether some come down early.
Erection scope: material only, or erection, modification and dismantling by a Gulf Orbit crew, and how often the scaffold is modified.
Site and transport: the city and site, laydown space and gate access for delivery vehicles.
Supervision and cards: supervisors, TUV-carded scaffolders or Aramco-approved scaffolding supervisors where the site requires them.
Send drawings or heights, dates and the site location, and the price comes back in the quotation. The scaffolding rental price guide explains each driver and how to compare two quotations.