Mechanical and electrical trades carry most of the certification and inspection load on an industrial site. Welding grades, rigging, pipe fitting and panel work are all scrutinised before a permit is issued, so these are the requests where documentation and worker screening matter most.
22 documented trades
Direct answer
Gulf Orbit supplies 22 mechanical and electrical trades across Saudi Arabia, including 6G X-ray welders, TIG and MIG welders, pipe fitters, riggers, industrial electricians and HVAC technicians, for oil and gas, petrochemical and industrial maintenance work.
Welds pipe in the 6G position — fixed at 45 degrees, welded all the way round — to a standard that passes radiographic inspection. This is the highest-qualification welding request on the register.
What they do on site
Weld pipe in the 6G fixed position to the applicable procedure
Prepare, fit up and align joints before welding
Produce welds that pass radiographic and visual inspection
Work to hot-work permit and confined-space requirements
Record joint numbers and welder identification for traceability
Trade, headcount, site location, start date, duration and shift pattern. Anything you can add about site access and permit requirements shortens the next step.
2
Requirement review
We confirm what is available against your dates and flag anything in the scope that will affect mobilization.
3
Worker matching
Workers are matched to the trade and to the site conditions — industrial versus building work are not interchangeable, and we do not treat them as such.
4
Documentation and client approval
Iqama, identification and trade documentation are submitted for your review. Nobody mobilizes before you approve the profiles.
5
Quotation and purchase order
Commercial terms are issued against the confirmed scope. A purchase order is required before mobilization.
6
Mobilization and site induction
Workers are briefed on your site induction, permit-to-work and access requirements before they start.
7
Ongoing support
Attendance, replacement and scale-up handled through a single point of contact for the duration of the requirement.
Documentation supplied with every worker
Iqama, identification and trade documentation are available for client review before mobilization. Where a client requires a specific certification or a trade test before a worker is accepted on site, say so in the requirement and it will be addressed during matching rather than after arrival.
Send your manpower requirement
Trade, headcount, site location, start date and duration. The more detail you send, the more precise the response.