Scaffold Inspection and Tagging in Saudi Arabia
Gulf Orbit inspects and tags scaffolds as a separate service, on structures it erected and on structures erected by other contractors or by your own team. The inspector checks each scaffold before first use, after every modification, after bad weather and at the interval your site procedure sets, tags it, and keeps the scaffold register up to date. Send the number of structures and the procedure your site follows, and a complete RFQ gets a reply within 24 hours.
All scaffolding servicesWhy a separate inspector
On many sites the team that erects a scaffold should not be the only one that signs it off. A separate inspector gives the site owner or main contractor an independent check, and keeps tags current when several subcontractors share the same structures. It also covers the gap when the original contractor has left but the scaffold stays in use.
When a scaffold is inspected
The exact intervals come from your site's procedure. The usual triggers are:
| Trigger | What the inspector does |
|---|---|
| Before first use | Full check of the base, ties, bracing, platforms, guardrails and access; tag issued |
| After any modification | Re-inspection of the changed part and what it affects; tag updated |
| After strong wind or rain | Check of ties, sheeting, base and boards before work resumes |
| At the site's interval | Routine re-inspection, often weekly; the tag records the date |
| Before dismantling | Check that the structure is safe to strike in the planned order |
What is checked
The inspector works from the ground up. The base: sole boards, base jacks and the ground beneath them. The structure: standards plumb, ledgers and transoms complete, bracing in place, couplers tight and ties at the spacing the design needs. The platforms: fully boarded, no gaps or traps, guardrails and toe boards fitted. Access: ladders or stairs secured and clear. Loading: the platform is not carrying more than its duty, and materials are stacked where the design allows.
Anything that fails is marked and reported, and the scaffold stays out of use until it is corrected and re-inspected.
Who inspects
Inspections are carried out by experienced scaffolding inspectors and supervisors. Where your site requires an Aramco-approved scaffolding supervisor, one can be supplied; the approval belongs to the supervisor personally, not to Gulf Orbit. Tell us which qualification or card your site requires for inspectors, and it is confirmed with the CV before mobilization.
Inspection only, or with corrections
Some sites want the inspector only: inspect, tag and report, while the erecting contractor makes corrections. Others want a small crew with the inspector to fix minor defects on the spot. Say which in the RFQ. For erection, modification and dismantling, see scaffolding erection and dismantling.

Scaffolding supervisor briefing a crew before work 
Scaffolding around pipework at an industrial plant 
Tube-and-coupler scaffolding
What to send for an inspection request
- Site and city, and the number of scaffolds or the scaffold register
- Who erected them, and the systems used
- Your site's inspection procedure, intervals and tag system
- The qualification or card your site requires for inspectors
- Inspection only, or with a small crew for corrections
- Start date and how long the inspections continue
Request scaffolding pricing
Scaffold inspection questions
Do you inspect scaffolds erected by other contractors?
Yes. Inspection and tagging is offered as a separate service, on structures erected by Gulf Orbit, by other contractors or by your own team.
How often should a scaffold be inspected?
Before first use, after any modification, after strong wind or rain, and at the interval your site procedure sets, which is often weekly.
Which tag colours do you use?
Your site's own tag system applies. Most Saudi sites use green for safe to use, a caution tag for use with conditions and red for do not use.
Do you keep a scaffold register?
Yes. The inspector keeps a register of every structure, its location, its tag status and its inspection history.
Can an Aramco-approved scaffolding supervisor do the inspections?
Where your site requires one, an Aramco-approved scaffolding supervisor can be supplied. The approval belongs to the supervisor personally, not to Gulf Orbit.
Can the inspector fix defects on the spot?
If you want corrections included, a small crew is supplied with the inspector. Otherwise the inspector tags and reports, and the erecting contractor corrects.
For supervision on your own crews, see Aramco-approved scaffolding supervisors; for shutdown access, see shutdown and turnaround scaffolding.